Labour camps, construction sites and remote facilities need sewage treatment that can be delivered quickly, installed with minimal civil work and relocated when the project moves.
SAKAR containerized and skid-mounted plants use MBBR or MBR technology in a modular package. Catalogue capacities run from 20 m³/day (about 100 people) to 500 m³/day (about 2,500 people).
Common challenges
- Fast delivery and installation with limited civil work
- Plants that can be relocated to the next project
- Varying occupancy as the workforce changes
- Reuse of treated water, for example for irrigation
- Simple, reliable operation on remote sites
Typical treatment process
- Collection and pumping – sewage pumps transfer wastewater to the plant.
- Screening – removes debris before treatment.
- Biological treatment – containerized MBBR or MBR plant.
- Filtration (optional) – for treated water reuse.
- Discharge or reuse – treated water is reused or discharged as permitted.
Every project is different. The final arrangement depends on your flow, wastewater characteristics and discharge or reuse requirements – our team will propose the right combination.
Supply across the UAE, Oman, GCC & worldwide
SAKAR supplies from Dubai and handles enquiries from the UAE (Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah, Fujairah), Oman (Muscat, Sohar, Duqm, Salalah), Saudi Arabia, Qatar, Kuwait, Bahrain, Africa, India, the UK, the USA and worldwide.
- UAE
- Dubai
- Abu Dhabi
- Sharjah
- Oman
- Muscat
- Saudi Arabia
- Qatar
- Kuwait
- Bahrain
- India
- Africa
- United Kingdom
- USA
- Worldwide







